philos65
Senior Member
So I finished basting together six panels with windows today. Tomorrow I sew them up and then wait for the next batch of basting tape to come in - I used way more than I thought I would. Then comes sewing it all together.
I'm still looking for different approaches to lifting and lowering the roof. I cruised the web and found this.
i'm thinking it would actually be pretty easy to rig up four pvc lift tubes connected to a small and inexpensive air compressor. Once the roof was raised, vertical emt braces could be situated to maintain stiffness of the sidewall, which apparently is totally necessary to buffer against wind.
Has anyone tried this?
Jeff
Laramie, WY
I'm still looking for different approaches to lifting and lowering the roof. I cruised the web and found this.
i'm thinking it would actually be pretty easy to rig up four pvc lift tubes connected to a small and inexpensive air compressor. Once the roof was raised, vertical emt braces could be situated to maintain stiffness of the sidewall, which apparently is totally necessary to buffer against wind.
Has anyone tried this?
Jeff
Laramie, WY