Picked up everything at FWC, the fridge got here today and I went to Lowes and got a sheet of 1/2 birch plywood. Now if it was just not so cold. I don't have that big heated shop. So I have been doing the small odd jobs. Made a transition sheet to fill the hole left where the heater vent was. It will not be where the 110v outside plug will be. Now I need to paint is so it matches the siding. Going to have a solar plug on each side of the camper for the folding solar to plug into. Everything takes longer than it should, FWC really put there stuff together. Need to move the right side panel where the stove was, on the cabinet that will now holds the fridge. Only need to move 1" to match the counter top, but will need to pull the bottom cabinet apart to get to two screws. This is going to be my winter project so the wife says don't hurry.
Bill