billharr
Senior Member
3-21-2014
Between TP and Dr appointments have not spend enough time on the camper. I am getting things buttoned up. have everything wired up 12v and 110v with GFI.
FWC monitor panel
Monitor showing battery full.
Put door up as one panel and then marked where I
wanted the cut. Helped to keep it square and match grain.
After the cut, large door folds all the way down.
Smaller door lays on seat. 30" wide opening.
Last door for the day, What does it hide?
Blue sea fuse box behind the door.
Not sure if I want to use magnetic latch, or
a matching slam latch.
Starting to look like a camper. note trim around the fridge.
I like how the cabinet has come out. Note the drawer fronts, trim and doors still need to have
poly-urethane put on. Just received the white birch iron on trim tape. Tomorrow I will put tape on edges of the drawers and doors. Put on the poly and then start on the corner cabinet next to the dinette.
You will see there are 7 surface screws where I could not get inside to put in screws. Camp-able now just need finish work. Hoping for a shake down trip to Pinnacles NP on the 31st.
Between TP and Dr appointments have not spend enough time on the camper. I am getting things buttoned up. have everything wired up 12v and 110v with GFI.
FWC monitor panel
Monitor showing battery full.
Put door up as one panel and then marked where I
wanted the cut. Helped to keep it square and match grain.
After the cut, large door folds all the way down.
Smaller door lays on seat. 30" wide opening.
Last door for the day, What does it hide?
Blue sea fuse box behind the door.
Not sure if I want to use magnetic latch, or
a matching slam latch.
Starting to look like a camper. note trim around the fridge.
I like how the cabinet has come out. Note the drawer fronts, trim and doors still need to have
poly-urethane put on. Just received the white birch iron on trim tape. Tomorrow I will put tape on edges of the drawers and doors. Put on the poly and then start on the corner cabinet next to the dinette.
You will see there are 7 surface screws where I could not get inside to put in screws. Camp-able now just need finish work. Hoping for a shake down trip to Pinnacles NP on the 31st.